Design of 12 miles of 115kV transmission line on wood pole H-frames using PLS-CADD and PLS-POLE. Engineering services included routing and permitting, specifications, material coordination, construction contract, field staking and construction observation.
Turley to Jemez Interconnect 115kV Transmission Line
Project Type:
Project Details:
Farmington Electric Utility System, Farmington, NM, 2007-2009