Feasibility Studies, System Impact Studies

Project Type: 
Project Details: 
Highline Electric Association, Holyoke, Colorado, 2009-Present

Generation interconnection Feasibility Studies and System Impact Studies (SIS) for several proposed wind generation sites. Load flow and dynamic analysis using PSS/E for using WECC and MRO system models. Short circuit analysis using Aspen Oneliner.